HC INTERIOR
HDB Standard Flat Designer Package
A) Professional Services1) Space Planning and Furniture Layout
2) Design Consultation
3) Furniture Consultation
4) Perspective Drawing on Carpentry Works
5) Material & Colour Proposal
6) Project Management & Site Supervision & Audit
7) Warranty With After Sales Services
8) Arrange & Co-ordinate Gas Works With PUB
9) Laying of 600 mm x 600 mm polished homogenous floor tiles c/w skirting @ living and dining
10) Laying of HDF Laminated flooring c/w skirting @ all bedrooms
11) Construct 50 mm cabinet base
12) Construct 50 mm washer base
13) Construct 50 mm fridge base
14) Construct shower kerb @ bathrooms
15) Construct main entrance kerb
16) Alteration of existing main gate
17) Replacement of standard copper piping
18) Labour for installation of storage or instant heater
19) Labour for installation of bathroom accessories
20) Labour for installation of kitchen sink
21) Laying concealed drainage pipe for kitchen sink
22) Laying concealed drainage pipe for washing machine
23) Construct false ceiling @ foyer area
24) Construct false ceiling @ bedroom passageway
25) Construct L box light holder @ living area
26) Construct L box light holder @ dining area
27) Construct 2 rolls of L box light holder @ master bedroom
28) Design & fabricate 20 ft kitchen cabinet in ABS trimming laminated door c/w
i Plywood postform worktop , designer handles & cultrey tray
ii Supply and install stainless steel dish rack
iii Labour to install cooker hood and hob
iv Stainless steel panel backing at cooker hob
29) Supply and install solid surface top ( 10 ft )
30) Design and fabricate 6 ft Length 8 ft Height feature wall c/w swing door in laminate / veener finish @ household shelter
31) Design and install 6 ' Length suspended TV console @ living area
32) Design and fabricate 6 ' Length wardrobe in laminated door finish @ master bedroom
33) Supply and install 10 mm tempered glass shower screen @ master toilet
34) Painting of whole unit wall and ceiling with ICI / Nippon emulsion paint
35) Painting of all pipes , doors , door frames & gate with glass paint
36) Painting or re-vanishing of existing main door
37) Laying of floor protection after completeion of flooring works
38) Chemical washing for whole unit
39) General cleaning upon completeion
| Usual Price | Promotion Price | |
| HDB 3-Room Flat | $15,488.00 | $14,388.00 |
| HDB 4-Room Flat | $16,388.00 | $15,188.00 |
| HDB 5-Room Flat | $17,288.00 | $15,988.00 |
| HDB Executive Apt | $18,788.00 | $17,388.00 |
Click to contact us for further details.